Barna Centre

Barna Centre

El carrer Comtal will improve!!

March 16th. 2010

From the 2nd of March until the 31th of May will proceed to the Redevelopment Comtal Street between Portal del Angel and Via Laietana to change the existing pavement and improve lighting. The demolition of the existing pavement and the placement of the new, will be made in installments (working in both longitudinal and transverse halves) at all times to allow the pedestrian crossing at the entrance to shops and housing. The passage through the side streets only be cut during the resurfacing work.

Our members

Aragaza
Bar Brusi
Equip Julià
Galeries Maldà
Restaurant Immersió
Tienda Movistar
Òptica Sisquella
Loading...
x
X